|
|
|
|
|
6
|
Sector
|
Tourism Tenders
|
Tender Value
|
N.A.
|
Location
|
Meghalaya Tenders
|
Ref.No
|
71811939
|
Closing Date
|
28 - May - 2024
|
9 Days to go
|
View Tender Details
|
|
Supply of Electric Kettle, Tv Wooden Pannel, Study Plug Point, Safety Vault, Bathroom Cubicles, Bed Side Runners, Laminate for Doors, Card Holder, Fan with Lights, King Size Bedsheet, Trolley, Luggage Trolley, Coffee Chair, Coffee Table, Cane Bed with Wooden Legs, Cane Bedside Table, Bed Headboard Wall Panel, Sliding Wardrobe, Tv Unit with Drawer, Mini Bar Fridge Cabinet, Luggage Rack, Study Table, Study Chair, Bathroom Vanity, Lg Mini Fridge Bar, Lg Television 50 Inches, Wall Painting, Curtains with Track, Sheer Main, Mattress, Pillow, Cushions with Covers, Wooden Flooring, Quilt, Mirror, Bed Runner, Ironing Machine, Iron Board, Dustbin, Towel Set for Bath Face H, Bedside Lights, Electric Kettle, Television Wooden St 4 Feet X 4 Feet, Study Table Plug Point, Bed Side Runner, Laminate for Door, 5 Seater Sofa Set with Centre Table, Coat St, Sofa, Table, Office Table, Office Chair, Lcd Unit, Painting, Carpet, Wall Clock - Furniture Furnishing. Qty : 696
|
|
|
|
|
|
10
|
Sector
|
Education And Research Institute Tenders
|
Tender Value
|
N.A.
|
Location
|
Meghalaya Tenders
|
Ref.No
|
70561238
|
Closing Date
|
24 - May - 2024
|
5 Days to go
|
View Tender Details
|
|
Supply of Steam Sterilizer 12 stu, Steam Sterilizer 8 stu, Washer Disinfecter, Ultrasonic cleaner, Drying Cabinet, Automatic Sealing Machine, Gauze cutting machine, SS Tables Big sizes, Documentation Labeller, Wasing Stations, Wire Storage shelf module, Modular Sterilizing Baskets, Modular Sterilizing Container, Sterile Trolley, Modular SS racks for Serile Stores, RO plant, Furnitures, software Computer systems, Turnkey works, 1 st year CMC, 2 nd year CMC, 3 rd year CMC, 4 th year CMC, 5 th year CMC, 1 to 6 months operation, 7 to 12 months operation, 13 to 18 months operation, 19 to 24 months operation, 25 to 30 months operation, 31 to 36 months operation, 37 to 42 months operation, 43 to 48 months operation, 49 to 54 months operation, 55 to 60 months operation - SITC Operation of CSSD at RCC Qty : 167
|
|
|